See every step from abroad — we handle everything
Living in London, Vienna or Berlin but your Budapest property needs renovation? Weekly photo reports, video calls at every milestone, fixed price in the contract. No surprises.
Why renovation from a distance is hard
Budapest property is attractive — but supervising the work without being there is unpredictable. These are the stories we hear most often on expat forums.
"I don't know who's working in my flat"
Unknown contractor, unknown subcontractors, no visibility — Budapest expat forums are full of stories about unreliable builders.
"I can't see what's going on"
You return months later and see only the finished result. If something went wrong during the work, it's too late — the tiles are already up.
"The price doubled mid-project"
Extra works, material surcharges, "turned out that…" — the final bill was double the quote. Expat.com is full of these Budapest renovation stories.
Four things that make remote renovation safe
Saying "we're trustworthy" isn't enough. We've built a concrete system so every step has full visibility.
Weekly photo report
Every week — typically on Fridays — we send a detailed photo set of all completed work. Demolition, framing, plumbing runs, tiling at every stage. Not a rushed WhatsApp snap but structured documentation.
Video calls at key milestones
After demolition (to show you what was behind the walls), before starting engineering works, and before handover. Google Meet or WhatsApp — whatever works for you. Every question answered before the next phase begins.
Fixed price in the contract
Itemised Excel quote for every work package and material. The signed total is the final invoice — no extras, no surcharges. If the client requests a change, we document it and update the quote accordingly.
Video handover + 2-year warranty
We walk through every room on a video call together — every space, every function tested live. The warranty certificate arrives by email. If anything comes up after handover, we come back at no charge.
A design plan means fewer decisions mid-build — and zero rework
For remote renovation this matters doubly: when everyone works from the same plan, there are no clarification calls across time zones — and no surprises at handover.
Faster build
Tradespeople don't wait for decisions — materials are ordered in advance, phases run without gaps. A design plan typically cuts build time by 10–15%.
Clear communication
3D visuals and an itemised material list replace vague verbal descriptions. Contractor, tradespeople, and client all read from the same document — no misunderstandings.
Saves on rework
Rework is the most expensive thing in renovation: double materials, double labour. Starting from a design plan prevents 90% of those scenarios — even from a distance.
Five steps to a finished flat — all online
From first contact to handover, every step can be completed without you being physically present.
Online consultation
Video call, requirements, questions — 30–45 min
Property survey
We visit, photograph and show you on video
Excel quote
2–3 days, itemised — by email, digitally signable
Construction
Weekly photo reports + video calls at milestones
Video handover
Online walkthrough + warranty certificate by email