Your store ready to open — fixed price.
Shop, showroom, boutique, pop-up — complete retail fit-out with a single contractor. Fast delivery, zero surprises.
Everything you need to open
From floor to shelving, from electrical to checkout — complete retail fit-out with a single contractor.
Shop & showroom
Flooring, wall finish, lighting, shelving, checkout, HVAC. Customer journey and product display planning.
Boutique & fashion store
Premium interior, custom furniture, fitting rooms, brand communication. Sustainable materials and custom execution.
Fast food & takeaway
Counter, service surface, kitchen connection, extraction, signage. HACCP-compatible fit-out for high turnover.
Lighting design
Product spotlights, ambient lighting, LED strips, logo illumination. The right light increases sales.
Electrical & data network
POS system wiring, terminals, data network, security cameras, alarm. Complete electrical solution.
Facade & entrance
Window display, storefront, signage, entrance design. First impression matters — invest in the exterior look.
Fast, reliable, fixed price
Every day closed costs money — opening fast matters, and at a fixed price.
Fast execution
Smaller shops ready in 2–4 weeks. Larger showrooms in 6–8 weeks. We meet deadlines — that's the guarantee.
Fixed price, zero surprises
Itemized Excel quote for all works. The contract price doesn't change — no additional costs afterwards.
Durable materials
Kerakoll, Mapei, Baumit — materials designed for intensive retail traffic. Less maintenance, longer lifespan.
Foreign brands & investors
Hungarian, English, Russian — full seamless communication for foreign franchises and investors.
6 steps to opening day
You know exactly when your store opens — transparent process from first contact to handover.
First contact
Reply within 4 hours. We learn the store concept and opening deadline.
Within 4hFree survey
On-site walkthrough, photo documentation, measurements. All affected areas assessed.
FreeExcel quote
Itemized estimate per work and material. This becomes the contract basis.
2–3 daysContract
Fixed price, locked deadline, penalty clause. Price is locked in the contract.
30% depositFit-out
Weekly photo reports. Fast pace — every day closed costs money. Coordination with furnishing.
+40% halfwayHandover + 2yr warranty
Joint walkthrough, snag list closed. Ready to open. Warranty document.
+30% final