Bathroom renovation is one of the most common jobs we do — and one of the most demanding, because mistakes show quickly here. A poor grout job, an uneven tile, or a leaking connection can cause problems for years. That's why this work is best left to experienced specialists.

Important to know: At ConSol, we only carry out bathroom renovations as part of a complete apartment renovation — we do not take on standalone bathroom projects. This ensures the bathroom is completed to the right standard, in harmony with the whole apartment.

Bathroom renovation cost in Budapest 2026

Bathroom sizeEconomyMid-rangePremium
3–4 m²1M–1.4M Ft1.4M–2.1M Ft2.1M–3.5M Ft
5–6 m²1.4M–2.1M Ft2.1M–2.8M Ft2.8M–4.9M Ft
7–10 m²2.1M–2.8M Ft2.8M–4.2M Ft4.2M–7M+ Ft

These prices include labour and mid-range materials. Sanitaryware (WC, washbasin, bath/shower) is not included — add separately.

Main cost items

Tiling: The biggest single item — in a bathroom we tile all walls and the floor. Labour: 16,000–35,000 Ft/m² (materials extra). A 5 m² bathroom can have 25–30 m² of total tile area.

Plumbing and sanitaryware: Replacing old pipes and fitting new sanitaryware: HUF 200,000–500,000 (depending on fixtures).

Electrical: Wet-room compliant electrical installation is mandatory. HUF 80,000–200,000.

Plasterboard, screed: If walls or floor need replacement: HUF 100,000–250,000.

The most expensive mistake: buying cheap tiles then paying high labour to install them. Ideal material-to-labour ratio: 40–60%. If you choose very cheap materials, don't cut corners on the tradesperson.

How long does it take?

A typical bathroom (5–6 m²) takes 10–16 working days: demolition (1–2 days), plumbing and electrical (2–3 days), tiling (3–5 days), sanitaryware, painting, finishing (2–3 days). With parallel trades this can be shorter.

Material selection tips

For bathroom tiles: slip resistance class (R9–R11 for floors), grout water resistance, and sanitaryware warranty period are the most important factors. Aesthetics matter, but durability comes first.

Frequently asked questions

Do I need a permit for bathroom renovation?

Cosmetic work — replacing tiles and fixtures — generally doesn't require a permit. Removing walls or relocating plumbing or gas pipes may require one. Always consult before starting structural changes.

What is the difference between ceramic and porcelain tiles?

Porcelain is denser, less water-absorbent, and more durable — ideal for floors and wet rooms. Ceramic is cheaper and easier to install, excellent for walls. For floors, always choose R9 or higher slip resistance.

How much can I save by buying materials myself?

Typically 10–15% on materials. However, quantities and dimensions must exactly match the quote — any mismatch means the contractor cannot take responsibility for fit or finish.